152 cu.m of dry aggregate is required to produce 100 cu.m of wet concrete. in this, for 1:2:4, total is=((1+2+4)=7). therefore, sand required is=((152/7)*1), fine aggregate is=((152/7)*2),coarse aggregate is=((152/7)*4).
Answered by
marimuthu
at
Oct 6, 2011 09:34 AM