Civil Engineering Technical Questions Answers - Ask a Civil Engineer

find volume of earth work of a ramp having slope in 1:20 top width 3.5 m side slope 1:2 height of the existing road is 5.5 m and slope 1:3, pl answer with calculation 

Asked in Highway Design & Maintenance - 503 days ago

Tags: highway road 

Answer now
Report abuse
Rate this : 1 1

Ask a Question

Ask now

Categories

© 2011-12 About Civil Engineering Site Ask Questions. Get Answers. All rights reserved.

Search